Skip to content
Snippets Groups Projects

Draft: Resolve "UI redesign"

Open Frank Sauerburger requested to merge 80-ui-redesign into master

Closes #80

Merge request reports

Pipeline #7984 waiting for manual action

Pipeline waiting for manual action for 58712a98 on 80-ui-redesign

Approval is optional
Merge blocked: 2 checks failed
Merge request must not be draft.
Merge conflicts must be resolved.

Merge details

  • The source branch is 48 commits behind the target branch.
  • 4 commits and 1 merge commit will be added to master.
  • Source branch will be deleted.

Activity

Filter activity
  • Approvals
  • Assignees & reviewers
  • Comments (from bots)
  • Comments (from users)
  • Commits & branches
  • Edits
  • Labels
  • Lock status
  • Mentions
  • Merge request status
  • Tracking
Please register or sign in to reply
Loading